Compute-intensive AI and research
High power per rack and direct liquid cooling for training and inference of AI models.

We develop modular data centers for AI, cloud, colocation and mission-critical IT. Standardized 10–25 MW building blocks are tailored to the site, available power and the customer's capacity requirements.
Compute-intensive AI models require more power per rack, liquid cooling and a grid connection that will hold for many years ahead. Sites with secured power determine where the next generation of data centers will be built.
At the same time, demand is growing for cloud services, colocation and secure operation of critical IT. We develop facilities that meet all these needs, on the same technical foundation and with a tailored design.
Every facility is built from the same standardized building block of 10–25 MW IT. The first phase operates on its own, and the next is added when the customer, power and land allow, without rebuilding the first. Capital is committed only when the need is there, and the size is set by the site, not by the concept.
A complete facility in operation, prepared for the next building block.
The same standard is repeated on site, with the same suppliers and quality assurance.
The site's power and land set the frame. The concept does not.
Power, cooling, redundancy and capacity per rack are sized according to how the facility will be used.
High power per rack and direct liquid cooling for training and inference of AI models.
Large, contiguous halls that can be built out in phases as the platform grows.
Separate IT zones with dedicated supply make it possible to host several customers in the same facility.
Redundant power paths, backup energy and a clear operating organization for systems that must not stop.
We follow technology developments in liquid cooling, heat recovery, water management, energy storage and flexible power use. What proves itself is brought into projects early, with reliability and verifiable benefit as the starting point.
The right conditions create capacity – when power, land and grid converge

A large share of hydro, nuclear and wind power provides low-emission electricity, and a power system with a long track record of reliability.
The cold climate allows facilities to use free cooling for much of the year, which lowers energy consumption.
A predictable regulatory framework, a stable economy and EU membership provide security for long-term investments.
Well-developed fiber networks and a large pool of engineers make it possible to build and operate advanced facilities.
Every development follows the same five steps. This makes projects comparable and decisions clear.
We define IT load, availability, operating model and potential future capacity.
We gather site data, grid connection, zoning conditions and environmental requirements.
We select hall size, number of floors, equipment yards and phasing.
Technology and construction contracts are competitively tendered on equal terms, for the best performance and total cost.
We lead construction, deliveries, testing and handover to operation, with room for the next phase.

Tell us about your requirements for power, availability and schedule, and we will show you how a facility can be designed for you.
Discuss capacity